Pe Ps Waste Plastic Making Pe Pelletizing Machine Granulation Production Line
Contact Person : Coco
Phone Number : +8618013292369
WhatsApp : +8618013292369
Minimum Order Quantity : | 1set | Price : | negotiation |
---|---|---|---|
Packaging Details : | film packed and container | Delivery Time : | 25-30 days |
Payment Terms : | Western Union, L/C, T/T |
Place of Origin: | Jiangsu,China | Brand Name: | Friend |
---|---|---|---|
Certification: | CE,SGS | Model Number: | SHJ |
Detail Information |
|||
Material: | PVC Powder And Calcium | Mixing Processing: | High Speed Mixer |
---|---|---|---|
Inverter: | ABB Inverter | Motor: | SIEMENS Brand Motor |
Temperature Controller: | Omron | Breaker: | DELIX Brand |
Max Capacity: | 250kg/h | ||
Highlight: | starch plastic recycling granulator machine,250kg/h plastic recycling granulator machine,starch pet flakes pelletizing machine |
Product Description
200-400kg/h PET pelletizing machine plastic pelletizer machine PET recycling line
Application
Normally, this machine line can be used for plastic mixing modification, filling modification,functional parent granules, coloring parent granules, reinforced glass fibres&carbon fibres, various cable materials, special materials, reaction extruding, exhausting and volatilization, powder paint.
Specification
Process | Applicable Material |
Mixing modification | PE, PP, PS+SBS; PA+ EPDM; PP+NBR; EVA+ silicon rubber; |
PE,PA,PC,CPE+ABS(alloy),ABS+TPU;PBT+PET;PP+PE | |
Filling modification |
PE, PP, EVA+ calcium carbonate, talcum powder, titanic powder; ABS, PC, PS+ aluminum hydroxide, magnesium hydroxide, antimony oxide |
PP, PA, ABS+ ferrous powder, sulphuric powder, ceramic powder | |
Functional parent granule |
PP, PA, ABS, PBT+ anti-burning agent and other auxiliary agents: combustion-supporting parent granule |
PE, PP, PS+ starch: de-composing parent granule | |
PE+ fog-preventing dipper, stabilizer: dual-prevention parent granule | |
PE, EVA, ABS+ carbon black: black parent granule | |
Coloring parent granule | PE, PP, ABS, AS, PA, EVA, PET+ pigment and auxiliary. |
Reinforced glass fibres & carbon fibres |
PP, PBT, ABS, AS, PA, PC, POM, PPS, PET+ long fires, small fibres, carbon fibres, crystals and so on. |
Various cable materials | HDPE,LDPE,LLDPE,MDPE,EVA,PVC,PP etc insulating cables, coatings; PE peroxide, silicon alkyl crossing cables; radialization crossing cables |
Special materials |
EVA heat-melting glue, polyurethane, fluorin rubber, fluorin plastics, PP cigarette filtering material and TPR sole material |
Reaction extruding |
polyamide condensate, polyamide melting polymerization, polyamide polyethene-adding, polycarbonate condensate |
Exhausting and volatilization | polystyrene oxide, high-absorbing resin, chlorine sulphur polythylene |
Powder paint | polyster, ring oxide, lactide, polyurethane, acrylate |
FAQ
1 .Q: If I am very interested in this machine or the machine is very similar to the machine I wanted, how to contact you?
A: You can send me an inquiry, I will reply you with 10 hours. Or You can send to my e-mail.
2. Q: If I need the machine urgently, do you have solutions?
A: We have some machines in our warehouse, if the machine match your demands, we can ship the machine to you within 7days after testing.
3. Q: If my machine can not work when I receive it, what will your factory do?
A: First of all, do not worry about the thing, we will test the machine before shipment. And if it happened, we will send our engineer to your factory to repair the machine.
4. Q: If my machine is broken within one year, what your factory will do?
A: Just send us some pictures and our engineer will analysis the reason, and send you broken parts for free.
5. Q: How can I believe your factory and machines.
A: We have CE, ISO certificates. And we have customers all around the world. You can have a visit to our factory before order. We can make a deal through TRADE ASSURANCE on Alibaba.com.
6. Q: How many days needed to finish the machine and what is about the payment?
A: Normally we use T/T payment. And normal machine need 30 working days. If we have the same machine in storage, it can be finished with 7 working days.
Machine pictures
Enter Your Message